Combined Heat Power Plant
211205
-
-
-
<strong>Complete Combined Heat Power Coal Plant with 5 MW Steam-Turbine and Electric Power Generator and 27MW Heat Capacity</strong><br /> <br /> Data of Boiler: <ul><li>Water-Pipe-Boiler with natural circulation (thermosyphon effect)</li><li>Steam capacity 30 – 34 to / hour</li><li>Max. operation pressure 90 bar</li><li>Steam temperature 500 Deg C</li><li>Fuel Coal</li><li>Max. Heat Capacity 27,6 MW</li><li>Water Temperature 130 Deg C</li><li>Year of Manufacture 1985 / frequently modernized and updated</li><li>Days of Operation per Year 300</li></ul> <br /> With AEG KANIS (SIEMENS) Steam Turbine and AEG LDW (SIEMENS) Generator, a modern Flue Gas Cleaning Unit and Feed Water Supply with desalination<br /> <br /> The Power Station is still in use and can be inspected by appointment in the South of Germany. It will become available for dismantling in 2024. Please contact andreas&#64;maynards.com
Mon Jan 29 05:00:00 UTC 2024
Sun, 3/20/22
Mon Jan 29 05:00:00 UTC 2024
  • General
  • Lots
  • Gallery

Date & Time

Mon, Jan 29, 20245:00 AM US/Eastern

Buyers Premium

18.0%

Combined Heat Power Plant

Details

Complete Combined Heat Power Coal Plant with 5 MW Steam-Turbine and Electric Power Generator and 27MW Heat Capacity

Data of Boiler:
  • Water-Pipe-Boiler with natural circulation (thermosyphon effect)
  • Steam capacity 30 – 34 to / hour
  • Max. operation pressure 90 bar
  • Steam temperature 500 Deg C
  • Fuel Coal
  • Max. Heat Capacity 27,6 MW
  • Water Temperature 130 Deg C
  • Year of Manufacture 1985 / frequently modernized and updated
  • Days of Operation per Year 300

With AEG KANIS (SIEMENS) Steam Turbine and AEG LDW (SIEMENS) Generator, a modern Flue Gas Cleaning Unit and Feed Water Supply with desalination

The Power Station is still in use and can be inspected by appointment in the South of Germany. It will become available for dismantling in 2024. Please contact andreas@maynards.com

Location

- - , - , - Germany

Contact

European Office
Europe@maynards.com