Private Treaty Sale | Unused & Uninstalled Electric Vehicle Powertrain Component Assembly & Winding Line
291825
Slaskie
-
-
Available for immediate sale due to overcapacity: complete manufacturing line for the assembly and wire-winding of high-voltage axle and drive components for electric drives comprising of subline for stator assembly, rotor winding and final testing. Equipment unused and uninstalled, YoM 2023. Make your offers now!<br /> <br /> STATOR LINE: <p><strong>Stator Section GROB Including the Following Operations and GROB Equipment:</strong></p> <ul><li>OP 005: Pallet in conveyor</li><li>OP 030: Insulating machine for HV-Motor Stators</li><li>OP 050: (4) Winding machines for any copper wire winding operations to adapted tooling</li><li>OP 070: (2) Pre-forming units for stator pre shaping, 20kN capacity</li><li>OP 120: (2) Final-forming unis for final stator shaping , 20kN capacity</li><li>OP 130: (2) Lacing unit for stators of 140mm or 210mm height (or other to adapted tooling), (5) servo presses</li><li>OP 140: Welding &#43; twisting unit with TRUMPF TruDisk 4002TD27 laser and KUKA KR 250R2700-2/FLR robot </li><li>GROB / BOSCH REXROTH conveyor system</li><li>OP 030 - OP 130 equipped with SIEMENS controls and FESTO pneumatics</li></ul> <p><strong>Stator Section AUMATIC Including:</strong></p> <ul><li>OP 015: End plate assembly (gluing) LOCTITE RC 32</li><li>OP 025: Laser engraving DATALOGIC AREX -420 MW, SIEMENS S7</li><li>OP 060 - OP135 (7 Stations) : Manual transport, universal conveyor system, width 480mm, FESTO pneumatics</li><li>OP 152: laser engraving, DATALOGIC AREX 420M PRO, SIEMENS SIMATIC DP</li><li>OP 140 / 157: Automatic transport, BOSCH REXROTH conveyor system, width 480mm</li></ul> <p><strong>Stator Section NKT Including:</strong></p> <ul><li>(3) NKT crimping stations, transformer KVT PSG 6250_00 STK, </li><li>Resistance welding units BOSCH REXROTH PSI 62 C 0.201.W1</li><li>SIEMENS S7 controls and servo motors, FESTO pneumatics</li></ul> <br /> ROTOR LINE: <p><strong>Rotor Line Working Stations:</strong></p> <ul><li>OP 010: Rotor stack loading with palletizing station/unloading by KUKA KR 120 R 2700-2/FLR robot, KEYENCE Laser barrier</li><li>OP 020: (3) rotor induction heating stations with S&amp;A CW6500EN water chillers</li><li>OP 010 / 030: KEYENCE vision system for rotor shaft orientation</li><li>OP 030: Rotor shaft loading with palletizing station/unlading by KUKA KR 120 R 2700-2/FLR robot, KEYENCE laser barrier</li><li>OP 040: Press KISTLER NCFN 200 (200kN, stroke 800mm) with monitoring, for shaft and stack joining</li><li>OP 060: Cooling tunnel with EURODIFROID KR 150 chiller (10 Deg C)</li><li>OP 070: End sheet management (specific) loading new end sheets and unloading used ones</li><li>OP 100: Pallet transport system with KEYENCE sensors for component verification (specific)</li><li>OP 110: servo press for compressing of rotor stacks with KUKA KR 120 R 2700-2/FLR robot</li><li>OP 120: DATALOGIC AREX 420 MW laser marking station</li><li>OP 200: BD TRONIC resin dispensing system (universal)</li><li>OP 220: (2) Inserting stations for magnets to rotor (specific)</li><li>OP 210 / 260: Magnet distribution station with (2) KUKA KR 10 R 1100-2/SEL robots</li><li>OP 350: (2) KUKA KR 210 R 2700-2 robots and 7th axes KL 4000/3400 and KL 4000/5400</li><li>OP 610 / 620 / 630: CEMB rotor balancing machines (universal)</li><li>OP 650: Balancing pin insertion station with KISTLER NCFN 20kN press and KUKA KR 50 R 2100/SEL robot</li><li>OP 660: Balancing pin distribution center with (5) vibratory feeders and KUKA KR 6 R 900-/SEL robot</li><li>OP 850: Final control station of balancing control with KUKA KR 120 R 2700-2/FLR (universal)</li><li>OP 900: Fnal packing of rotors to pallets (1.300 x 900mm) with KUKA KR 180 R 3500-2K/FLR robot, KEYENCE laser barrier •Working Stations equipped with SIEMENS IPCs and SIEMENS servo motors</li></ul> <br /> FINAL TESTING &amp; ASSEMBLY: <p>TITAN TEAL Final Asembly Line Comprising of:</p> <ul><li>OP 020: Inner housing and stator assembly station with two (2) KISTLER NCFN 2153A presses TNX030 induction heating, KUKA KR 120 R 2700-2 robot, (2) CPUs 1512SP F-1 PN and (4) CPUs 1517F-3PN/DP</li><li>OP 020: X-ring assembly, manual station (universal)</li><li>OP 040: Outer housing sub-assembly with (2) KISTLER NCFN 2153A servo presses, KUKA KR 120 R 2700-2 robot</li><li>OP 050: Spring washer assembly (specific)</li><li>OP 060: Rotor to A-shield assembly with KUKA KR 120 R 2700-2 robot</li><li>OP 060A: Rotor magnetizing station with MAGSYS MFFer 8/160/250 magnetising system</li><li>OP 060B: Rotor to A-shield assembly with (2) KISTLER NCFN 2153A presses</li><li>OP 070: Outer housing to rotor assembly with KISTLER NCFN 30 (kN) servo press</li><li>OP 080A: Pre-screwing station for A-shield with 6 bolts</li><li>OP 080B: Oil dispensing station (specific)</li><li>OP 080C: BOSCH REXROTH EC 304 nutrunner with torque control for final screwing</li><li>OP 085: Rotation station vertical to horizontal</li><li>OP 090: Tube cutting and sleeve inserting station</li><li>OP 100: Manual station for gasket installation (interconnector assembly)</li><li>OP 110A: Sub-assembly station for cooling unit with (2) KISTLER NCFN servo presses</li><li>OP 110B: Main-assembly of cooling unit with (2) KISTLER NCFN 2153A servo presses</li><li>OP 110C: Screwing station for cooling unit with BOSCH REXROTH EC 304 nutrunner with torque and angle control</li><li>OP 120: Manual station for interconnector disassembly</li><li>OP 130A / 130B: Leak testing station with (2) LTC 902 RM leak testers (specific)</li><li>OP 140: Manual station for cap assembly</li><li>OP 150: DATALOGIC AREX 420 MW laser marking and dot penn station</li><li>BOSCH REXROTH T5 conveyor system with various gear box motors and lifters</li><li>Line equipped with SIEMENS HMI TP 900 controls and MAXYMOS NC 5847B0 process monitoring</li></ul> <p>End Of Line Testing:</p> <ul><li>Static Tester DEUTRONIC for resistance, resistance symmetry and insulation measurement functionality</li><li>BOSCH REXROTH T5 conveyor system</li></ul> <br />  
Mon Mar 31 10:00:00 UTC 2025
Wed, 1/01/25
Mon Mar 31 10:00:00 UTC 2025

Date & Time

Mon, Mar 31, 202510:00 AM US/Eastern

Type

ONLINE

Buyers Premium

18.0%

Private Treaty Sale | Unused & Uninstalled Electric Vehicle Powertrain Component Assembly & Winding Line

Details

Available for immediate sale due to overcapacity: complete manufacturing line for the assembly and wire-winding of high-voltage axle and drive components for electric drives comprising of subline for stator assembly, rotor winding and final testing. Equipment unused and uninstalled, YoM 2023. Make your offers now!

STATOR LINE:

Stator Section GROB Including the Following Operations and GROB Equipment:

  • OP 005: Pallet in conveyor
  • OP 030: Insulating machine for HV-Motor Stators
  • OP 050: (4) Winding machines for any copper wire winding operations to adapted tooling
  • OP 070: (2) Pre-forming units for stator pre shaping, 20kN capacity
  • OP 120: (2) Final-forming unis for final stator shaping , 20kN capacity
  • OP 130: (2) Lacing unit for stators of 140mm or 210mm height (or other to adapted tooling), (5) servo presses
  • OP 140: Welding + twisting unit with TRUMPF TruDisk 4002TD27 laser and KUKA KR 250R2700-2/FLR robot 
  • GROB / BOSCH REXROTH conveyor system
  • OP 030 - OP 130 equipped with SIEMENS controls and FESTO pneumatics

Stator Section AUMATIC Including:

  • OP 015: End plate assembly (gluing) LOCTITE RC 32
  • OP 025: Laser engraving DATALOGIC AREX -420 MW, SIEMENS S7
  • OP 060 - OP135 (7 Stations) : Manual transport, universal conveyor system, width 480mm, FESTO pneumatics
  • OP 152: laser engraving, DATALOGIC AREX 420M PRO, SIEMENS SIMATIC DP
  • OP 140 / 157: Automatic transport, BOSCH REXROTH conveyor system, width 480mm

Stator Section NKT Including:

  • (3) NKT crimping stations, transformer KVT PSG 6250_00 STK, 
  • Resistance welding units BOSCH REXROTH PSI 62 C 0.201.W1
  • SIEMENS S7 controls and servo motors, FESTO pneumatics

ROTOR LINE:

Rotor Line Working Stations:

  • OP 010: Rotor stack loading with palletizing station/unloading by KUKA KR 120 R 2700-2/FLR robot, KEYENCE Laser barrier
  • OP 020: (3) rotor induction heating stations with S&A CW6500EN water chillers
  • OP 010 / 030: KEYENCE vision system for rotor shaft orientation
  • OP 030: Rotor shaft loading with palletizing station/unlading by KUKA KR 120 R 2700-2/FLR robot, KEYENCE laser barrier
  • OP 040: Press KISTLER NCFN 200 (200kN, stroke 800mm) with monitoring, for shaft and stack joining
  • OP 060: Cooling tunnel with EURODIFROID KR 150 chiller (10 Deg C)
  • OP 070: End sheet management (specific) loading new end sheets and unloading used ones
  • OP 100: Pallet transport system with KEYENCE sensors for component verification (specific)
  • OP 110: servo press for compressing of rotor stacks with KUKA KR 120 R 2700-2/FLR robot
  • OP 120: DATALOGIC AREX 420 MW laser marking station
  • OP 200: BD TRONIC resin dispensing system (universal)
  • OP 220: (2) Inserting stations for magnets to rotor (specific)
  • OP 210 / 260: Magnet distribution station with (2) KUKA KR 10 R 1100-2/SEL robots
  • OP 350: (2) KUKA KR 210 R 2700-2 robots and 7th axes KL 4000/3400 and KL 4000/5400
  • OP 610 / 620 / 630: CEMB rotor balancing machines (universal)
  • OP 650: Balancing pin insertion station with KISTLER NCFN 20kN press and KUKA KR 50 R 2100/SEL robot
  • OP 660: Balancing pin distribution center with (5) vibratory feeders and KUKA KR 6 R 900-/SEL robot
  • OP 850: Final control station of balancing control with KUKA KR 120 R 2700-2/FLR (universal)
  • OP 900: Fnal packing of rotors to pallets (1.300 x 900mm) with KUKA KR 180 R 3500-2K/FLR robot, KEYENCE laser barrier •Working Stations equipped with SIEMENS IPCs and SIEMENS servo motors

FINAL TESTING & ASSEMBLY:

TITAN TEAL Final Asembly Line Comprising of:

  • OP 020: Inner housing and stator assembly station with two (2) KISTLER NCFN 2153A presses TNX030 induction heating, KUKA KR 120 R 2700-2 robot, (2) CPUs 1512SP F-1 PN and (4) CPUs 1517F-3PN/DP
  • OP 020: X-ring assembly, manual station (universal)
  • OP 040: Outer housing sub-assembly with (2) KISTLER NCFN 2153A servo presses, KUKA KR 120 R 2700-2 robot
  • OP 050: Spring washer assembly (specific)
  • OP 060: Rotor to A-shield assembly with KUKA KR 120 R 2700-2 robot
  • OP 060A: Rotor magnetizing station with MAGSYS MFFer 8/160/250 magnetising system
  • OP 060B: Rotor to A-shield assembly with (2) KISTLER NCFN 2153A presses
  • OP 070: Outer housing to rotor assembly with KISTLER NCFN 30 (kN) servo press
  • OP 080A: Pre-screwing station for A-shield with 6 bolts
  • OP 080B: Oil dispensing station (specific)
  • OP 080C: BOSCH REXROTH EC 304 nutrunner with torque control for final screwing
  • OP 085: Rotation station vertical to horizontal
  • OP 090: Tube cutting and sleeve inserting station
  • OP 100: Manual station for gasket installation (interconnector assembly)
  • OP 110A: Sub-assembly station for cooling unit with (2) KISTLER NCFN servo presses
  • OP 110B: Main-assembly of cooling unit with (2) KISTLER NCFN 2153A servo presses
  • OP 110C: Screwing station for cooling unit with BOSCH REXROTH EC 304 nutrunner with torque and angle control
  • OP 120: Manual station for interconnector disassembly
  • OP 130A / 130B: Leak testing station with (2) LTC 902 RM leak testers (specific)
  • OP 140: Manual station for cap assembly
  • OP 150: DATALOGIC AREX 420 MW laser marking and dot penn station
  • BOSCH REXROTH T5 conveyor system with various gear box motors and lifters
  • Line equipped with SIEMENS HMI TP 900 controls and MAXYMOS NC 5847B0 process monitoring

End Of Line Testing:

  • Static Tester DEUTRONIC for resistance, resistance symmetry and insulation measurement functionality
  • BOSCH REXROTH T5 conveyor system

 

Location

- Slaskie , - , - Poland

Contact

European Office
Europe@maynards.com